I. Pre-Start Inspection
1. Equipment Appearance Inspection: Confirm that the drums are free from deformation and cracks, the support rollers and retaining rollers are securely fastened, and the drive chain/belt tension is appropriate.
2. Lubrication System Inspection: Ensure the reducer and bearing housing oil levels are normal, the oil is clean, and the oil passages are unobstructed.
3. Sealing and Piping Inspection: Ensure the inlet and outlet seals are intact, the hot air duct and dust removal duct connections are tight, and there are no air leaks or blockages.
4. Electrical System Inspection: Ensure the control cabinet indicator lights and instruments are normal, the emergency stop button is sensitive, the motor grounding is reliable, and the sensors are effectively calibrated.
5. Material System Inspection: Ensure the feed hopper is free of debris, the screw conveyor is unobstructed, and the discharge port is free of accumulated material blockages.
6. Environmental Confirmation: Clean any residue inside the drums, confirm there are no foreign objects or personnel remaining inside, and close and lock the maintenance door.
II. No-load Test Run
1. Start the induced draft fan first. After the air pressure stabilizes, start the main drum motor and run it at low speed for 5–10 minutes.
2. Observe whether the drum runs smoothly and whether there are any abnormal noises, vibrations, or jerking.
3. Check whether the motor current and bearing temperature are normal, and whether there is any air leakage at the seals.
4. Test whether the speed regulation function is stable. After confirming that there are no abnormalities, gradually increase the speed to the set speed and run it continuously for 15 minutes.
III. Feeding and Normal Operation
1. After the no-load operation is normal, turn on the heat source system to preheat the drum until the outlet temperature reaches the process requirements (usually 60–120℃).
2. Start the feeding device and use a gradual feeding method. The initial feed rate is 30%–50% of the rated value.
3. Gradually increase to full load, while adjusting the hot air temperature, air volume, and drum speed to ensure that the moisture content of the discharged material meets the standards.
4. Maintain uniform feeding during operation to prevent material interruption, blockage, or stalling.
IV. Key Points for Operation Monitoring
1. Drum Rotation Speed: Maintain stable speed; avoid overspeeding or underspeeding, which may affect drying efficiency.
2. Temperature Monitoring: Inlet and outlet temperature fluctuations should be within the allowable range.
3. Current Monitoring: Motor current must not exceed the rated value.
4. Discharge Status: Ensure continuous and smooth discharge, free of wet, burnt, or clumped material.
5. Inspection every 30 minutes: Check bearing temperature (≤70℃), lubrication status, and dust removal system operation.
V. Shutdown Procedure
1. First, stop the feed, but continue rotating the drum and induced draft fan to completely discharge any remaining material.
2. Gradually reduce the heat source supply until the drum temperature drops below 50℃, then shut down the heat source system.
3. Continue idling for 10–15 minutes to allow the drum to cool evenly and prevent thermal deformation.
4. Stop the feeder, drum unit, and induced draft fan in sequence, and disconnect the main power supply. 5. After shutdown, clean the feed hopper, discharge port, and residual material inside the drum. Rinse the hot air ducts and dust collector filter bags.
6. Check the wear of seals, support rollers, and gears. Replenish lubricating oil and tighten bolts.
VI. Safety Precautions
1. When the equipment is running, it is strictly forbidden to approach rotating parts, and maintenance, lubrication, or cleaning is prohibited.
2. Maintenance must be carried out with the power off, tagged, and locked to prevent accidental restart.
3. Do not open the maintenance door before the drum has completely stopped to prevent material from spraying out or causing mechanical injury.
4. Take protective measures for high-temperature parts to prevent burns.
5. Flammable and explosive materials require controlled oxygen content and temperature; open flames are strictly prohibited.
6. Keep the dust collection system unobstructed to prevent dust accumulation and the risk of explosion.