The standard production process for a paintball-making machine centers on the rotary-die encapsulation technique. The complete workflow encompasses four key stages: raw material pretreatment, forming and encapsulation, drying and setting, and quality inspection and packaging. Industrial-grade production lines are capable of a continuous, stable output of tens of thousands of paintballs per minute.
🧪 Raw Material Pretreatment Stage
1. Raw materials for the shell-such as gelatin, glycerin, and deionized water-are precisely weighed according to the formula and heated in a melting tank to 120°C until thoroughly liquefied and blended.
2. A vacuum degassing process is applied to remove all air bubbles from the gelatin solution, preventing the formation of "hollow" or defective shells during the subsequent molding phase.
3. Simultaneously, the internal fill liquid is prepared by blending PEG, food-grade coloring, and additives. The mixture is filtered to remove impurities and then transferred to a temperature-controlled storage tank.
4. The gelatin solution, now degassed, is transported via a sealed piping system into the spreader box of the main machine, which is kept at a constant temperature of 85°C.
⚙️ Rotary-Die Encapsulation and Forming Stage
1. The machine applies the gelatin solution evenly onto a cooling drum, creating a continuous gelatin ribbon of uniform thickness.
2. Two such gelatin ribbons are fed simultaneously between counter-rotating rotary dies. Hemispherical cavities on the surface of the dies press the ribbons into the shape of half-shells.
3. As the two half-shells align precisely, an injection wedge dispenses a metered amount of fill liquid into the cavity with an accuracy of ±1%.
4. As the rotary dies continue to turn, the two half-shells are heat-sealed together under a clamping pressure of 0.1–0.5 MPa. The resulting paintballs are then cut and separated from the gelatin web.
🌬️ Two-Stage Drying and Setting Process
1. Freshly formed paintballs are immediately fed into a tumble dryer (rotary drum dryer), where gentle rotation removes residual paraffin oil from the surface and eliminates approximately 50% of the surface moisture.
2. Following tumble drying, the paintballs are spread evenly onto food-grade trays and moved into a temperature- and humidity-controlled drying chamber.
3. In the drying room, temperature and relative humidity are strictly controlled at 24°C and 20%–30%, respectively. Continuous circulating airflow facilitates moisture removal, and the products are left to rest for 24–48 hours to allow the outer shell to cure and set.
✅ Quality Inspection and Finished Product Packaging
1. Products are visually inspected by operators to remove defective items-such as those that are deformed, leaking, or incomplete-followed by screening using a laser diameter gauge to filter out any units with diameter deviations exceeding specified tolerances.
2. Samples undergo drop-ball brittleness tests and test-firing (flight) trials to ensure the outer shells meet the required performance criteria: remaining intact during high-speed flight while shattering upon impact with a target.
3. Qualified finished products are fed into an automated packaging machine and portioned by standard weight-typically approximately 2,500 units per box-before the boxes are sealed and moved to storage.