Dryer installation method

Nov 18, 2019

Leave a message

According to the process plan layout diagram and installation construction drawing, foundation drawing, equipment outline size and mutual spacing, etc. drawn by the technical department, the basic construction and equipment handling shall be in place. When designing the equipment process floor plan, the following factors should be considered for equipment positioning.

(1) should meet the needs of the process

(2) It should be convenient to store, transport and clean the workpiece.

(3) The outer dimensions of the equipment and its attachments, the extreme position of the moving parts and the safety distance

(4) The requirements for equipment installation, maintenance and operation safety should be guaranteed.

(5) Matching the work of the plant and equipment, including the width and height of the door, the span of the plant, the height, etc.

According to the relevant requirements of mechanical equipment installation and acceptance, the equipment should be installed and leveled to ensure stable installation, reduce vibration, avoid deformation, ensure processing accuracy and prevent unreasonable wear. Before the installation, technical supervision should be carried out, and the construction personnel should carefully study the relevant technical materials of the equipment to understand the equipment performance and safety requirements and the construction requirements.

During the installation process, the construction of the foundation, assembly links, electrical wiring and other projects must be carried out in strict accordance with the construction specifications. If there are special requirements such as constant temperature, shockproof, dustproof, moisture proof, fireproof, etc. in the installation process, measures should be taken, and the conditions can be used to carry out the construction of the project.